project design
建立多个设计方案模型并利用BIM技术的三维可视化特性,直观、高效地对设计方案进行对比、分析。
Multiple design scheme models are established and the 3D visualization characteristics of BIM technology are used to compare and analyze the design schemes intuitively and efficiently.查看更多
preliminary design
利用BIM技术可视化、可模拟的特性,对总平面布置、建筑物外立面、室内平面布置、精装修、绿色建筑、等方案进行对比、分析与选择,对交通组织、人员疏散以及建筑物性能等进行分析。
By using the visual and simulable characteristics of BIM technology, the general layout, building facade, interior layout, fine decoration, green building and other schemes are compared, analyzed and selected, and the traffic organization, personnel evacuation and building performance are analyzed.查看更多
Design of construction drawings
在建模的同时对图纸进行核查,将发现的图纸问题汇总成图纸核查报告,并反馈至设计单位与建设单位,由前者负责解决发现的问题。
At the same time of modeling, the drawings shall be checked, and the problems found in the drawings shall be summarized into the drawings check report and fed back to the design unit and the construction unit, and the former shall be responsible for solving the problems found.查看更多
construction phase
施工现场总平面布置将施工各个阶段的现场平面布置图变成三维模型,并结合施工进度计划,验证各个阶段的机具布置,堆场设置等是否合理,提前进行优化。
The overall layout of the construction site turns the site layout of each stage of construction into a three-dimensional model. Based on the construction schedule, the equipment layout and yard setting of each stage are verified to be reasonable and optimized in advance.查看更多
Operational phase
包含建筑运营数据信息、建筑空间与位置信息、设备属性信息和运行维护信息,不同专业系统的关联信息等,实现建筑运维的可视化的运维管理。
It contains building operation data information, building space and location information, equipment attribute information, operation and maintenance information, and association information of different professional systems, so as to realize visual operation and maintenance management of building operation and maintenance.查看更多